Bike Marrickville
  • Home
  • About
  • Join
  • News
  • Advocacy
  • Rides
  • Maps
  • Meetings
  • Projects
  • Donate
Bike News · Inner West

The local riding beat

Bike Marrickville's take on what matters in the Inner West.

Connect the dots: back a joined-up riding network for Sydney

19/10/2026

0 Comments

 
Picture
Sydney already has thousands of kilometres of good paths. What it doesn’t have is a network. A new petition asks the NSW Government to fix that.

Anyone who rides in the Inner West knows the feeling. The GreenWay or the Cooks River path is a joy, until it ends and you’re back in traffic. Each good section is only as useful as the gaps on either side of it, and those gaps are where most people give up on the bike and reach for the car keys.

The petition, started by Daniel Morrison, calls for an Active Transport Superhighway: a continuous network of separated paths across the whole Sydney basin. Its argument is that most of this network already exists. By the petition’s count, around 2,000 km of good paths are already built, and much of the rest is open land along rail lines, waterways and motorways that mainly needs designating and signposting. It estimates that only about 100 km of new path, plus around a hundred bridges, tunnels and crossings, would join it all up, without taking road space or parking from anyone.

The real obstacle, the petition argues, is organisational, not financial. Roads and rail are planned by the State, but walking and cycling paths are still left to individual councils. Each council has to lobby for funding segment by segment, with no citywide plan to connect them. The result is a lot of money spent on studies and consultations for a network nobody can actually use end to end.

The ask is simple: that the Premier adopt a basin-wide plan and set up an authority to deliver it.

You can explore the proposed routes, down to individual streets and corridors, on the Active Transport Superhighway map. It’s worth a look just to see how close we already are.
​
Nearly 1,000 people signed in the petition’s first week. Let’s help push it well past that.

✍️ Sign the petition on Change.org →
0 Comments



Leave a Reply.

    More bike news

    Authors

    Ellis Bou-Harb
    ​President Bike Marrickville

    Tom Watson
    Secretary Bike Marrickville

    Sander Ottes
    Website Bike Marrickville

    Archives

    October 2026
    September 2026
    August 2026
    June 2026
    May 2026
    April 2026
    November 2014
    September 2014
    June 2014
    April 2014

    Categories

    All

    RSS Feed

Proudly powered by Weebly